Marina Heights
Marina Heights, regional headquarters for State Farm, is the largest office development in Arizona history, a LEED Silver design concept that covers 20 acres and 2 million square feet.
Greenfield Dynamics has supplied over $1.5 million dollars in pumping equipment on this project.
This project was completed through working with Bel-Aire Mechanical, Comfort Systems USA and TD Industries.
The Marina Heights project was completed using the following materials:
Submersible Deck Drain Sump Pump Packages
Qty (12) Pre-packaged Duplex Deck Drain Sump Pump Systems, each with:
(2) Ebara DLFMU Explosion Proof pumps, 5 through 20 HP
(1) QuantumFlo Touch Screen Level Controllers
(1) Topp Industries 96" x 96" Above Ground Fiberglass Basin
Submersible Nuisance & Elevator Pit Sump Pumps
Qty (70) Ebara DLFMU Explosion Proof Pumps, 2 through 7-1/2 HP
QuantumFlo Touch Screen Level Controllers, Simplex & Duplex
Domestic Water Booster Pump Systems
Qty (3) QuantumFlo QuadPlex 15 HP Systems
Domestic Water Heater packages
Qty (16) Hubbell Electric Water Heaters with Wilo Circ Pumps, Wessels Expansion tanks